← Back to Job

Initial Estimate (Quote)

Job: Repair Greenhouse
Customer: Donna
Status: draft

Add Line Item Edit Estimate Settings Print Quote Track Actuals AI Scope Assistant AI Line Suggestions

Estimate Lines

Section Item Qty Unit Material Labour Subcontractor Other Line Total
Demolition General demolition labour
Remove existing fittings, linings or fixtures
1.00 hour $0.00 $900.00 $0.00 $0.00 $900.00 Edit | Delete
General Waste disposal allowance
Skip bin or waste removal allowance
1.00 each $0.00 $0.00 $350.00 $0.00 $350.00 Edit | Delete
Preliminaries Project management allowance
Allowance for coordinating the greenhouse repair works, ordering materials and managing site activities.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Preliminaries Site setup allowance
Allowance for basic site setup for repair works including access and protection of work area.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Preliminaries Travel / mobilisation allowance
Allowance for travel to site and mobilisation of labour, tools and materials.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Demolition General demolition labour
Allowance to strip out and remove the existing shoddy shed elements ready for repair and rebuild works.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Site Works Ground preparation
Prepare the site for the new concrete floor, including clearing and levelling as required.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Concrete Concrete slab preparation
Prepare for a new concrete floor including set-out, base preparation and forming as needed.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Concrete Concrete supply and place
Supply and place concrete floor for the greenhouse repair works.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Framing Timber wall framing
Supply and install timber wall framing associated with the shed/greenhouse repair.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Framing Structural timber beam allowance
Allowance for any additional structural timber required to support the repair, including roof framing interfaces.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Roofing Corrugated iron roofing
Supply roofing material suitable for the greenhouse/shed repair.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Roofing Corrugated roofing installed
Install corrugated roofing to the repaired truss roof structure.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Roofing Roof flashing allowance
Allowance for flashings required to weatherproof roof junctions and edges.
1.00 m $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Roofing Spouting / guttering installed
Install spouting or guttering if required to suit the repaired shed/greenhouse.
1.00 m $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Hardware Fixings and fasteners allowance
Allowance for fixings, nails, screws, brackets and general hardware required for the repair works.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
General Materials allowance
Allowance for miscellaneous materials not otherwise captured in the estimate.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Waste Waste disposal allowance
Allowance for disposal of demolition waste and offcuts arising from the repair works.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
General Contingency allowance
Provisional allowance for unforeseen issues uncovered during repair of the existing shed structure.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Subcontractors Engineering allowance
Allowance only if structural advice or engineering input becomes necessary for the truss roof or concrete floor scope.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Subtotal Cost $1,250.00
Margin 20.00% $250.00
Price ex GST $1,500.00
GST 15.00% $225.00
Total Quote $1,725.00