← Back to Estimate
Edit Line Item
Estimate:
Initial Estimate
Job: Repair Greenhouse
Customer: Donna
Section
Item Name
Description
Provisional allowance for unforeseen issues uncovered during repair of the existing shed structure.
Quantity
Unit
Each
Allowance
Hour
Day
Metre
Lineal metre
Square metre
Cubic metre
Kilogram
Tonne
Sheet
Pack
Lot
Item
Material Unit Cost
Labour Hours / Unit
Subcontractor Cost
Other Cost
Line Notes
Use at builder discretion; do not assume full use.
Save Changes
Cancel