← Back to Estimate
Edit Line Item
Estimate:
Initial Estimate
Job: Repair Greenhouse
Customer: Donna
Section
Item Name
Description
Prepare the site for the new concrete floor, including clearing and levelling as required.
Quantity
Unit
Each
Allowance
Hour
Day
Metre
Lineal metre
Square metre
Cubic metre
Kilogram
Tonne
Sheet
Pack
Lot
Item
Material Unit Cost
Labour Hours / Unit
Subcontractor Cost
Other Cost
Line Notes
Quantity to be measured once floor size is confirmed.
Save Changes
Cancel