← Back to Job

Initial Estimate (Quote)

Job: Repair Greenhouse
Customer: Donna
Status: draft

Add Line Item Edit Estimate Settings Print Quote Track Actuals AI Scope Assistant AI Line Suggestions

Estimate Lines

Section Item Qty Unit Material Labour Subcontractor Other Line Total
Preliminaries Project management allowance
Allowance for coordinating the greenhouse repair works, ordering materials and managing site activities.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Preliminaries Travel / mobilisation allowance
Allowance for travel to site and mobilisation of labour, tools and materials.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Demolition General demolition labour
Allowance to strip out and remove the existing shoddy shed elements ready for repair and rebuild works.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Concrete Concrete slab preparation
Prepare for a new concrete floor including set-out, base preparation and forming as needed.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Roofing Corrugated iron roofing
Supply roofing material suitable for the greenhouse/shed repair.
1.00 m2 $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Roofing Roof flashing allowance
Allowance for flashings required to weatherproof roof junctions and edges.
1.00 m $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Roofing Spouting / guttering installed
Install spouting or guttering if required to suit the repaired shed/greenhouse.
1.00 m $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
General Materials allowance
Allowance for miscellaneous materials not otherwise captured in the estimate.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Waste Waste disposal allowance
Allowance for disposal of demolition waste and offcuts arising from the repair works.
1.00 allowance $0.00 $0.00 $0.00 $0.00 $0.00 Edit | Delete
Subtotal Cost $0.00
Margin 20.00% $0.00
Price ex GST $0.00
GST 15.00% $0.00
Total Quote $0.00