Job: Repair Greenhouse
Customer: Donna
Status: draft
Add Line Item Edit Estimate Settings Print Quote Track Actuals AI Scope Assistant AI Line Suggestions
| Section | Item | Qty | Unit | Material | Labour | Subcontractor | Other | Line Total | |
|---|---|---|---|---|---|---|---|---|---|
| Preliminaries |
Project management allowance
Allowance for coordinating the greenhouse repair works, ordering materials and managing site activities. |
1.00 | allowance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |
| Demolition |
General demolition labour
Allowance to strip out and remove the existing shoddy shed elements ready for repair and rebuild works. |
1.00 | allowance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |
| Concrete |
Concrete slab preparation
Prepare for a new concrete floor including set-out, base preparation and forming as needed. |
1.00 | m2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |
| Roofing |
Corrugated iron roofing
Supply roofing material suitable for the greenhouse/shed repair. |
1.00 | m2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |
| Roofing |
Roof flashing allowance
Allowance for flashings required to weatherproof roof junctions and edges. |
1.00 | m | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |
| Roofing |
Spouting / guttering installed
Install spouting or guttering if required to suit the repaired shed/greenhouse. |
1.00 | m | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |
| General |
Materials allowance
Allowance for miscellaneous materials not otherwise captured in the estimate. |
1.00 | allowance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |
| Waste |
Waste disposal allowance
Allowance for disposal of demolition waste and offcuts arising from the repair works. |
1.00 | allowance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Edit | Delete |