← Back to Job

Bathroom renovation (Quote)

Job: Install Fencing
Customer: Donna
Status: draft

Add Line Item Edit Estimate Settings Print Quote Track Actuals AI Scope Assistant AI Line Suggestions

Estimate Lines

Section Item Qty Unit Material Labour Subcontractor Other Line Total
Demolition Remove existing bathroom fittings
Remove existing vanity, toilet and shower ready for renovation.
1.00 allowance $0.00 $375.00 $0.00 $0.00 $375.00 Edit | Delete
Demolition Waste disposal allowance
Allow for disposal of removed bathroom fittings and renovation debris.
1.00 each $375.00 $225.00 $0.00 $0.00 $600.00 Edit | Delete
Framing Re-line bathroom walls
Supply and install new wall lining to bathroom walls ready for finishing.
1.00 allowance $0.00 $675.00 $0.00 $0.00 $675.00 Edit | Delete
Bathroom Waterproof floor and shower
Apply waterproofing to bathroom floor and shower areas before tiling.
1.00 allowance $650.00 $900.00 $0.00 $0.00 $1,550.00 Edit | Delete
General Tile bathroom floor and shower walls
Supply and install tiles to bathroom floor and shower walls.
9.00 m2 $3,150.00 $1,350.00 $0.00 $0.00 $4,500.00 Edit | Delete
General Install new vanity
Install client-selected new vanity in bathroom.
3.00 hours $0.00 $225.00 $0.00 $0.00 $225.00 Edit | Delete
General Install new toilet
Install client-selected new toilet and reconnect services.
5.00 hour $0.00 $375.00 $0.00 $0.00 $375.00 Edit | Delete
General Toilet 1.00 each $750.00 $0.00 $0.00 $0.00 $750.00 Edit | Delete
General Vanity 1.00 each $560.00 $0.00 $0.00 $0.00 $560.00 Edit | Delete
Subtotal Cost $9,610.00
Margin 40.00% $3,844.00
Price ex GST $13,454.00
GST 15.00% $2,018.10
Total Quote $15,472.10